Huadian Technology ›› 2014, Vol. 36 ›› Issue (10): 46-48.

Previous Articles     Next Articles

Utilization and optimal reformation of original cooling tower in unit reconstruction project

  

  1. (Shandong Electric Power Engineering Consulting Institute Corporation Limited, Jinan 250013, China)
  • Online:2014-10-25 Published:2014-11-20

Abstract: Abstract:In demolition and reconstruction process of the original coalfired unit, the gas displacement of the condenser of newbuilt unit was enlarged. It was determined by check computation that the original cooling tower can not satisfy the requirement of fullload generation. The optimization measures, such as to reform the cooling tower, to increase the condenser area and to increase the condenser backpressure, were proposed. After the cooling tower was optimized and reformed, the cooling efficiency of the cooling tower was maximized, and the economic efficiency of the unit was improved greatly.

Key words: Keywords:cooling tower, filler, unit reconstruction, backpressure