Abstract: Abstract:In demolition and reconstruction process of the original coalfired unit, the gas displacement of the condenser of newbuilt unit was enlarged. It was determined by check computation that the original cooling tower can not satisfy the requirement of fullload generation. The optimization measures, such as to reform the cooling tower, to increase the condenser area and to increase the condenser backpressure, were proposed. After the cooling tower was optimized and reformed, the cooling efficiency of the cooling tower was maximized, and the economic efficiency of the unit was improved greatly.
Key words: Keywords:cooling tower, filler, unit reconstruction, backpressure
LI Peng. Utilization and optimal reformation of original cooling tower in unit reconstruction project[J]. Huadian Technology, 2014, 36(10): 46-48.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2014/V36/I10/46