Abstract: Abstract:Taking the 1000MW ultra supercritical unit of Guangdong Huizhou Pinghai Power Plant Company Limited as example, the turbine supervisory instrument system (TSI) was introduced.Based on the previous maintenance experiences, a scheme to improve the stability and reliability of the system was proposed. According to the scheme, the gap of the eddy current probe was amended, and the data processing modules were configured rationally. The measures ensure the accuracy of the system data measurement, the correctness of the data communication with third part and the stability of system operation.
Key words: Keywords:ultra supercritical unit, steam turbine, turbine supervisory instrument system (TSI), reliability, improvement
CHEN Ruilin. Debugging and improvement of TSI system of 1000MW ultra supercritical unit[J]. Huadian Technology, 2014, 36(3): 34-36.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2014/V36/I3/34
Application of acoustic blockage removal technique applied in urea pyrolysis furnaces
Derating and efficiency optimization operation of wind turbines running above cutout wind speed
Energysaving transformation of vacuum pump in 660MW steam turbine generator set
Analysis and treatment of abnormal vibration of a steam turbine of 600MW unit