Huadian Technology ›› 2014, Vol. 36 ›› Issue (3): 34-36.

Previous Articles     Next Articles

Debugging and improvement of TSI system of 1000MW ultra supercritical unit

  

  1. (Guangdong Huizhou Pinghai Power Plant Company Limited, Huizhou 516363, China)
  • Online:2014-03-25 Published:2014-06-11

Abstract: Abstract:Taking the 1000MW ultra supercritical unit of Guangdong Huizhou Pinghai Power Plant Company Limited as example, the turbine supervisory instrument system (TSI) was introduced.Based on the previous maintenance experiences, a scheme to improve the stability and reliability of the system was proposed. According to the scheme, the gap of the eddy current probe was amended, and the data processing modules were configured rationally. The measures ensure the accuracy of the system data measurement, the correctness of the data communication with third part and the stability of system operation.

Key words: Keywords:ultra supercritical unit, steam turbine, turbine supervisory instrument system (TSI), reliability, improvement