Huadian Technology ›› 2014, Vol. 36 ›› Issue (6): 17-19.
Previous Articles Next Articles
Published:
Abstract: Abstract:Based on theoretical calculation, the stator hoisting equipment stress in a coal fired power plant was monitored during the process of overload construction by resistance strain gauge method; then the test data derived were compared and contrasted with lifting equipment safety data, so as to ensure the security of major stressed areas and guarantee safe and stable overload construction of hoisting equipment.
Key words: Keywords:stator hoisting, overload construction, stress test, strength
ZHU Chen. Analysis and supervision of stator hoisting equipment press under overload construction[J]. Huadian Technology, 2014, 36(6): 17-19.