Abstract: Abstract:In the technical innovation project of Datang Shanxi Lueyang Power Plant, in order to ensure the 179t generator stator hoisting to be completed successfully, based on comparison, the hoisting scheme was determined. The temporary facilities adopted in the scheme were introduced. The difficulties and innovation points of the scheme were analyzed. The strength check result was given. The scheme was adopted, and the stator hoisting was completed safely and successfully.
Key words: Keywords:generator stator, hoisting, innovate
WU Qianping. Hoisting of 179t generator stator in technical innovation project of Datang Shaanxi Lueyang Power Plant[J]. Huadian Technology, 2014, 36(6): 28-29.