Huadian Technology ›› 2014, Vol. 36 ›› Issue (6): 30-32.

Previous Articles     Next Articles

Analysis on reformation of merging of induced draft fan and booster fan for 600MW thermal power unit

  

  1. (Huaneng Tongchuan Zhaojin Power Plant, Tongchuan 727100, China)
  • Online:2014-06-25 Published:2014-08-05

Abstract: Abstract:Taking two 600MW coalfired power units of Huaneng Tongchuan Zhaojin Power Plant project phase I as example, the technical reformation scheme of “merging induced draft fan and booster fan” was analyzed. The economical efficiency and the auxiliary power rate of the units after reformation were compared with those indexes of the units before reformation. After the reformation, the induced draft fan operates stably, and the expected reformation goal was achieved.

Key words: Keywords:induced draft fan, booster fan, twoinone reformation, auxiliary power rate, economical efficiency