Huadian Technology ›› 2014, Vol. 36 ›› Issue (6): 30-32.
Previous Articles Next Articles
Published:
Abstract: Abstract:Taking two 600MW coalfired power units of Huaneng Tongchuan Zhaojin Power Plant project phase I as example, the technical reformation scheme of “merging induced draft fan and booster fan” was analyzed. The economical efficiency and the auxiliary power rate of the units after reformation were compared with those indexes of the units before reformation. After the reformation, the induced draft fan operates stably, and the expected reformation goal was achieved.
Key words: Keywords:induced draft fan, booster fan, twoinone reformation, auxiliary power rate, economical efficiency
LI Haihao, ZHAO Pengfei, ZHANG Defu, LI Xiaoting. Analysis on reformation of merging of induced draft fan and booster fan for 600MW thermal power unit[J]. Huadian Technology, 2014, 36(6): 30-32.