Huadian Technology ›› 2014, Vol. 36 ›› Issue (7): 32-33.
Previous Articles Next Articles
Published:
Abstract: Abstract:In Inner Mongolia and other areas with rich wind resource, in the winter heat supply period, there is difficulty for power grid in wind power accommodation. The CPI Inner Mongolia Siziwang Banner Wind Power Heat Supply Project was introduced. To use the wind power instead of coalfired boiler to supply heat for cities and towns can increase the local wind power accommodation capacity and lighten the pressure of the power grid in power longdistance transmission. The project is useful for effective utilization of wind energy and reducing consumption of coal and other fossil fuels.
Key words: Keywords:wind farm, heat supply station, wind power accommodation on power grid, demonstration
WANG Jianqiang. Introduction of CPI Inner Mongolia Siziwang Banner Wind Power Heat Supply Project and its demonstration effect[J]. Huadian Technology, 2014, 36(7): 32-33.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2014/V36/I7/32