Abstract: Abstract:The ultrasupercritical steam turbine of a certain power plant 1000MW was not installed with rapid cooling module. Under condition of did not transform system equipment, synchronizing rapid cooling of turbine and boiler maintenance by vacuum method, which has decreased unit energy consumption when startup rapid cooling, and increased economical efficiency of power plant.
Key words: Keywords:vacuum method, rapid cooling of steam turbine, boiler maintenance, synchronizing
WU Chunchao, CHEN li. Synchronizing rapid cooling of steam turbine and boiler maintenance use vacuum method[J]. Huadian Technology, 2014, 36(7): 34-36.