Huadian Technology ›› 2014, Vol. 36 ›› Issue (9): 37-39.
Previous Articles Next Articles
Published:
Abstract: Abstract:In the coal handling system of Inner Mongolia Datang Togtoh Power Generation Company Limited, an accident of main shaft fracture of the bucketwheel stackerreclaimer occurred suddenly. After urgent repairs, the accident had been controlled in minimum margin. Combining with site actual situation, the reasons of the main shaft fracture accident were analyzed in detail. The analysis result is useful for preventing similar accident.
Key words: Keywords:bucketwheel stackerreclaimer, main shaft, variable crosssection, fracture, reason analysis
FENG Yufeng. Analysis on reasons of fracture failure of main shaft of bucketwheel stackerreclaimer[J]. Huadian Technology, 2014, 36(9): 37-39.