Huadian Technology ›› 2015, Vol. 37 ›› Issue (10): 15-16.

Previous Articles     Next Articles

Analysis and governance of pipes sinking reason for reheat steam heat section

  

  1. Huadian Electric Power Research Institute,Hangzhou 310000,China
  • Online:2015-10-25 Published:2016-01-13

Abstract:

Abstract:A certain power plant found that a part of the reheat steam heat section of pipeline keep sinking.Site investigation and calculating check and analysis confirms that the main reason causing sinking pipes is that the actual mass of pipes exceeds design value.Meanwhile, property abnormality of constant support disc spring hangers at the site aggravate pipes sinking tendency. According to working characteristics of each bearing hangers,taking measures as replace constant hangers and increase output load of variable spring support and hanger can be effective solution of pipes sinking.

Key words: ">Keywords:">reheat steam heat section">;">pipessinking">;">wall thickness">;">constant support disc spring hangers