Huadian Technology ›› 2015, Vol. 37 ›› Issue (12): 10-14.
Previous Articles Next Articles
Published:
Abstract:
Abstract:According to the problem cause by coal sampling device for QCZ-I train handling,this paper introduced a new method to handle this problem.This upgraded device was introduced from its overall structure,big and small car system,sampling system,and sample preparation system and its mechanical structure optimization.Practice shows that stability and reliability of this sampling device has been increased a lot.Also,this device provide accurate basis for monitoring coal quality.
Key words: ">Keywords:">coal ">fired power plant, coal as received, sampling system, sample preparation system, mechanical structure
SUN Yong. Optimal design for coal sampling device through train handling[J]. Huadian Technology, 2015, 37(12): 10-14.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2015/V37/I12/10
Feasibility research on redundancy removal and derating of coal handling systems in large and medium coalfired power plants
Cause analysis and solution for ignition failure of V94.3A gas turbine
Problems and countermeasures of environmental protection equipment after ultralow emission transformation
Water balance test and watersaving recommendations for gasfired power plants