Huadian Technology ›› 2015, Vol. 37 ›› Issue (4): 4-4.

Previous Articles     Next Articles

Analysis on vibration reasons of speed controller oil pipeline of unit No.3 in Huanglongtan Hydropower Station and treatment

  

  1. (Hubei Huanglongtan Hydropower Plant, Shiyan 442000, China)
  • Online:2015-04-25 Published:2015-06-02

Abstract: Abstract:In Huanglongtan Hydropower Station, in the processes of startup, shutdown and load regulation of the unit No.3, the vibration of the speed controller oil pipeline was too large, which seriously threatened safe and stable operatin of the unit. According to analysis, some measures, such as to reinforce the speed controller oil pipeline and to readjust the route and time of the speed controller in startup and shutdown process, were adopted. The vibration of the oil pipeline was eliminated effectively.

Key words: Keywords:speed controller, oil pipeline, vibration, reinforce