Huadian Technology ›› 2015, Vol. 37 ›› Issue (7): 6-8.
Previous Articles Next Articles
Published:
Abstract:
Abstract:The designed coal of the Selfsupply Power Plant of Xinjiang Xinte Energy Company Limited is the Eastern Junggar coal. The preparation before unit slidingparameter shutdown, the parameter control during slidingparameter shutdown and matters needing attention were analyzed. The feasible slidingparameter shutdown technology for Eastern Junggar coalfired boiler was explored. The turbine casing temerature can be reduced quickly and effectively after shutdown by the technology, and this remains sufficient time for unit overhaul.
Key words: Keywords:boiler, Eastern Junggar coal, slidingparameter shutdown
LI Peng, ZENG Qi. Research on slidingparameter shutdown technology for unit with Eastern Junggar coalfired boiler[J]. Huadian Technology, 2015, 37(7): 6-8.