Huadian Technology ›› 2015, Vol. 37 ›› Issue (8): 36-39.

Previous Articles     Next Articles

Failure analysis and its preventive measures for RUNBACK test of forced draft fans

  

  1. 1.Department of Thermal Engineering, Tsinghua University, Beijing 100084,China; 2.Technical Service CenterHuadian Power International Corporation Limited, Jinan 250014, China
  • Online:2015-08-25 Published:2015-11-09

Abstract:

Abstract:A RUNBACK(RB)test of forced draft fans for boiler in 1000MW plant unit failed and caused the boiler extinguished. An onsite combustion diagnosis test is carried out. After that, a deep analysis on the results of the test, history data and the onsite combustion conditions and corresponding rectification measures are given. After the implementation of the rectification measures, the boiler combustion condition is improved significantly and the RB test of forced draft fans for boiler is carried out successfully.

Key words: Keywords:RUNBACK, forced draft fans, boiler extinguished, combustion stability, turbulent burner