Abstract:According to the national environmental protection requirements, Tianjin Junliangcheng Power Generation Company Limited needs to reconstruct the desulfurization and denitrification systems of No.5 to No.10 power units. Aimed at the condition of large variety of auxiliary power capacity, this paper proposed two reconstruction schemes, compared the two schemes, and finally determined the reconstruction scheme.
Key words: Keywords:desulfurization, denitrification, capacity extension, auxiliary power, common transformer
TAN Pengzhan. The determination of adjustment schemes of electrical auxiliary system for environment protection alteration[J]. Huadian Technology, 2015, 37(9): 63-64.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2015/V37/I9/63
Problems and countermeasures of environmental protection equipment after ultralow emission transformation
Application of flow field simulation in SCR honeycomb denitrification catalyst mold design
Optimization design for electrical control systems in gas distributed energy stations
Study of aeroderivative gas turbines applied in industrial park integrated energy systems