Thermal power project cable and cable tray settlement method study

  

  1. Huadian Laizhou Power Generation Company Limited, Laizhou 261441,China
  • Online:2016-12-25 Published:2017-02-04

Abstract:

Abstract:Cable lying and cable tray installation is an important process in thermal power plant construction. There is always big difference between design quantity and real work quantity. Based on practical experience, a design material and site measurement incorporated settlement method was indicated. The difficulty of cable and cable tray settlement was solved. Audit risk was avoided. Building cost was reduced. 