Keywords:boiler;CFB;desulfurization system;CO2; limestone powder; environmental protection

  

  1. Shaoguan Pingshi Power Plant Company Limited (Plant B), Shaoguan 512229,China
  • Online:2016-03-25 Published:2016-05-18

Abstract:

Abstract:Based on Huadian Shaoguan Pingshi Power Plant Company Limited’s 2×300MW CFB boiler, this paper analyzed the problems of thelimestone powder feeding system.Considering the environmental protection policy,the addition of one set of new type limestone powder feeding system solved the fluctuation of CO2 emission and massive consumption of limestone.