Contrast and recommendation of reconstruction scheme for desulfurization and increasing efficiency of a certain 330MW unit

  

  1. 1.Shandong Shenhua Shanda Energy & Environmentr Company Limited,Jinan 250014, China; 2.Shandong Hongao Power Technology Company Limited, Jinan 250101, China
  • Online:2016-04-25 Published:2016-07-11

Abstract:

Abstract:Green power generating plan was proposed when environmental awareness is heightened nowadays. This plan has been requested that a certain environmental index of projects need to meet nearly zero release, for instance, limited value of SO2 emission concentration must above 35mg/m3, which makes existing desulfurization utility face reformation of capacity expansion. Taking a certain 330MW unit as an example, this paper analyzed current problem and through contrastive analysis, brought forward feasible economic and technical reformation plan.