Discuss of ultracritical secondary reheat megawatts unit high pressure heater Layout

  

  1. Huadian Jiangsu Power Company Jurong Power Plant, Jurong 212400, China
  • Online:2016-05-25 Published:2016-07-15

Abstract:

Abstract:By introducing the structure and performance feature of coiler, to apply coiler high pressure heater to instead Utube high pressure heater was proposed. By analyzing the second phase of Huadian Jiangsu Power Plant Company Jurong Power Plant’s double reheat  of high pressure heater, the reliability and feasibility of coiler high pressure heater was introduced.