Huadian Technology ›› 2016, Vol. 38 ›› Issue (5): 54-56.
Previous Articles Next Articles
Published:
Abstract:
Key words: Keywords:circulating fluidized bed boiler, tubetype preheater, ash deposition, air leakage, air heater
DU Jiajun.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2016/V38/I5/54
Optimization of air preheater leakage control system in 670MW unit