Huadian Technology ›› 2016, Vol. 38 ›› Issue (6): 28-30.
Previous Articles Next Articles
Published:
Abstract:
Key words: Keywords:double reheat, ultra supercritical, steam turbine, performance test, heat rate
ZHOU Renmi,WU Henggang,DONG Yihua,ZHU Bao.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2016/V38/I6/28
Energysaving transformation of vacuum pump in 660MW steam turbine generator set
Analysis and treatment of abnormal vibration of a steam turbine of 600MW unit
Reasons analysis for tube blasting and preventive measures for superheater of 1000MW supercritical boiler