Huadian Technology ›› 2016, Vol. 38 ›› Issue (7): 25-27.

Previous Articles     Next Articles

Gassteam combined circulating heat and peakload unit hot start improvement

  

  1. Hangzhou Huadian Xiasha Thermal Power Company Limited, Hangzhou 310018, China
  • Online:2016-07-25 Published:2016-09-23

Abstract:

Abstract:To increase the economical efficiency of 6FA combined circulating heat and peakload unit hot start, steam that unqualified for stream turbine stroke was utilized for heat supplying by applied desuperheating and reducing devise. Economical efficiency analysis indicated that unit operation cost was reduced after improvement.

Key words: