Zhejiang Beilun Power Plant KPAV100 reducer gear damage cause and renovation

  

  1. Beijing Power Equipment General Factory Company Limited, Beijing 100160, China
  • Online:2016-07-25 Published:2016-09-23

Abstract:

Abstract:Zhejiang Beilun Power Plant unit No.1 was put into operation in 1991. Due to worse coal condition and increasing heat load, pulverizer load was increased accordingly. Which caused reducer overload, gear damage, thrust pad temperature rise and other problems. Thus the power plant planned to extend pulverizer capacity. After disassembled one reducer and analyzed gear damage, parts characteristics was outlined, improvement plan was made. 

Key words: