Huadian Technology ›› 2017, Vol. 39 ›› Issue (1): 38-39.

Previous Articles     Next Articles

Direct firing pulverizing system coal powder pipe blockage test and treatment

  

  1. China Datang Corporation Science and Technology Research Institute Central China Branch, Zhengzhou 450000, China
  • Online:2017-01-25 Published:2017-03-23

Abstract:

Blockage frequently happened on a power plant’s No.4 pulverizer. After times of examination and adjustment, this problem remained. By tests of powder pipe air speed, coal powder fineness and powder concentration, the cause of blockage was determined as partial powder aggregation. After adjusting pulverizer separator damper, blockage was eliminated.

Key words: