670MW supercritical unit valve switching failure cause analysis and treatment

  

  1. Liaoning Dongke Electrical Power Company Limited, Shenyang 110006, China
  • Online:2017-05-25 Published:2017-06-07

Abstract:

In a power plant’s 670MW supercritical unit startup stage, valve switching of total valve (TV) and governing valve (GV) failed. After analyzing HPIP cylinder unite startup speed and valve switching logic, and comparing the stress of main stop valve before and after opening, the failure cause was indicated that main steam pressure and reheat steam pressure are too low. Authors claimed that by adjusting the pressure of main steam and reheat steam would reduce the opening and pressure difference of GV. This will ensure the success of valve switching and reduce the valve switching time.