Service power system reconstruction plan and application practice after thermal power plant unit close down

  

  1. Huadian Zibo Heat and Power Company Limited, Zibo 255054, China
  • Online:2017-06-25 Published:2017-07-10

Abstract:

With the development of energy saving and emission control, it is inevitable that small coalfired units be close down. After Huadian Zibo Heat and Power Company Limited third stage extension project (2×330MW) unit put into operation, the first stage was closed down. Due to the relevance of first and second stagey water, steam, coal and electricity system, this paper introduced a service power system reconstruction plan based on safety economy and smooth transition. Combined with specific implementation process,relevant project management method and experience was summarized.