Huadian Technology ›› 2017, Vol. 39 ›› Issue (6): 51-54.

Previous Articles     Next Articles

A 600MW power plant boiler pulverizing system  undercapacity cause analysis

  

  1. Zhanjiang Zhongyue Energy Company Limited, Zhanjiang 524000, China
  • Online:2017-06-25 Published:2017-07-10

Abstract:

The problem of output capacity of 600MW power plant boiler No.1 pulverizing system was analyzed based on tests. The causes were indicated, and suggestion for improvement was provided. Based on theoretical calculation, this problem could be remarkably improved.

Key words: