The site of a power plant in Vietnam was selected on southwestern coastal alluvial plain, based on the geological exploration report, there was 10.75 to 22.00m clay and silt clay exists in site shallow subgrade. This layer of clay is widespread, low intensity and high deformation, which seriously threatened the structural safety of power plant. During the construction plan discussion phase, soft clay foundation pretreatment plan was discussed based on the different bearing capacity requirements and different construction progress. This paper introduced the pretreatment plan and its discussion progress. Which could be referred for similar problem.