Study on optimization scheme of circulating water in system commissioning period of a domestic nuclear power plant

  

  1. State Nuclear Engineering Company, Shanghai 200233,China
  • Online:2018-07-25 Published:2018-08-24

Abstract:

A domestic nuclear power plant is the first AP1000 nuclear power plant in the world, and it is also the first domestic nuclear power plant using circulating pump with adjustable blade structure. The circulating water system is the debugging basis of the conventional island process system. Its debugging schedule is critical to other systems’ debugging. According to the characteristics of the circulating water system in the nuclear power plant, the commissioning period is optimized, which greatly shortens commissioning period of the system.