  1. Anhui Huadian Suzhou Power Generation Company Limited, Suzhou 234101, China
  • Online:2018-08-25 Published:2018-09-20

Abstract:

In a digital electrohydraulic control system(DEH) of a power plant’s #1 unit, there had been many faults on linear variable differential transformer(LVDT) and valve position (VP) jamming before the upgrading of LVDT and VP. It puts forward the scheme and practical procedure of a redundancy making and upgrading transformation. After the redundancy making and upgrading transformation, safety and stable operation coefficient of steam turbine is increased.