Technical schemes for waste heat deep utilization in gas distributed energy stations

  

  1. 1.China Huadian Engineering Company Limited, Beijing 100070, China2.Huadian Distributed Energy Engineering Company Limited, Beijing 100070, China

  • Online:2019-12-25 Published:2020-01-17

Abstract:

To increase the utilization rate of gas distributed energy stations,taking the design of a distributed energy project as an example, analysis was made from equipment selection, operation mode, investment and operation economy, and a waste heat deep utilization scheme was proposed. The technical scheme was introduced from the technological process  and operation modes under different load conditions in detail, and its economy was compared with conventional technical schemes.If there is sufficient and stable heating demand, distributed energy project can be economic within a reasonable waste heat deep utilization scheme.

Key words: