Feasibility research on redundancy removal and derating of coal handling systems in large and medium coalfired power plants

  

  1. China Energy Engineering Group Guangdong Electric Power Design Institute Company Limited, Guangzhou 510663, China

  • Published:2019-09-25

Abstract:

At present, the working hours of coalfired  units are declining, and there is great redundancy in the output of coal handling systems. Based on the status quo and expectation for power generation market, it analyzed the operational reliability and output of the coal handling systems and proposed feasible redundancy removal schemes.Under the premise of dualconfiguration for coal handling systems, it is feasible to cut the redundant ouput. It is recommended to reduce the output of the coal system and optimize the system configuration in new or rebuilt projects.

Key words:

font-size: 10.5pt, mso-spacerun: 'yes', mso-font-kerning: 1.0000pt">coalfont-size: 10.5pt, mso-spacerun: 'yes', mso-font-kerning: 1.0000pt">font-size: 10.5pt, mso-spacerun: 'yes', mso-font-kerning: 1.0000pt">fired power plant, coal transportation system, redundancy, reduce output, power generation market;dualfont-size: 10.5pt, mso-spacerun: 'yes', mso-font-kerning: 1.0000pt">font-size: 10.5pt, mso-spacerun: 'yes', mso-font-kerning: 1.0000pt">circuit configuration