Huadian Technology ›› 2019, Vol. 41 ›› Issue (9): 78-80.

Previous Articles    

Transformation methods for PT slowmelting judgment of UN 5000 excitation system

  

  1. Guangdong Zhuhai Jinwan Power Generation Company Limited, Zhuhai 519050, China

  • Online:2019-09-25 Published:2019-10-18

Abstract:

An excitation system should provide complete judgment function for PT disconnection to prevent the generator set tripping caused by excitation system overexcitation. Since the shortcomings of the original PT disconnection logic of  UN 5000 excitation system, there are hidden dangers of overexcitation in excitation system caused by PT slow melting.By attaching an external detection device for PT disconnection or setting up a PT slowmelting logic inside the software,  the hidden danger  caused by PT slow melting can be eliminated, and the reliability of generator sets can be improved.

Key words:

font-size: 10.5pt, mso-spacerun: 'yes', mso-font-kerning: 1.0000pt">excitation system, PT disconnection logic, PT slow melting, overfont-size: 10.5pt, mso-spacerun: 'yes', mso-font-kerning: 1.0000pt">font-size: 10.5pt, mso-spacerun: 'yes', mso-font-kerning: 1.0000pt">excitationPT