Huadian Technology ›› 2012, Vol. 34 ›› Issue (2): 62-64.
• 技术交流 • Previous Articles Next Articles
CAO Yusheng
Received:
Revised:
Online:
Published:
Abstract: In the Lianzhou Power Plant of Guangdong Lianzhou Yuelian Power Plant Company Limited, at the process of AC and DC oil pump test of the turbine lubrication oil system of unit No.2, the overpressure valve of the lubrication oil system was unable to reset normally and quickly; and this leaded to low oil pressure and tripping of the steam turbine. After this, in two times hotstate rolling processes of the steam turbine, the vibration of bearing bush No.1 was exceeded the standard, the turbine had been tripped. The main reasons of this fault and the exposed problems were analyzed, and the relevant preventive measures were put forward, which can be used as reference for other power plants.
Key words: steam turbine, lubrication oil, rolling, bearing bush, vibration, shut down
CAO Yusheng. Analysis and treatment of overvibration of bearing bush in turbine rolling process[J]. Huadian Technology, 2012, 34(2): 62-64.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2012/V34/I2/62
Study on the structure design of quadrangle towerframe steel chimney
Influence of 600MW supercritical unit steam distribution characteristics on shaft vibration
Analysis and treatment of abnormal vibration of industrial water pump
Energysaving transformation of vacuum pump in 660MW steam turbine generator set