Huadian Technology ›› 2012, Vol. 34 ›› Issue (10): 52-54.
• 技术交流 • Previous Articles Next Articles
GENG Weizhong1, HAO Xiangjun2
Received:
Revised:
Published:
Abstract:
Some problems, such as the short operation cycle, the small amount of the prepared water, the frequent regeneration of the resin and others, existed
in the mixed bed for condensed water fine treatment of the 2×600MW direct air cooled unit of the Shanxi Xingneng Power Generation Company Limited project
phase II. The reasons of the problems were found from several aspects, which include the quality of the mixed bed input water, the purity of the regenerating
agent, the amount of the ammonia added into the feed water and the conveying of the exhausted resin. The improvement measures were proposed, and the practice
shows that the effects of the measures are favorable.
Key words: condensed water, fine treatment, mixed bed, amount of prepared water, operation cycle
GENG Weizhong;HAO Xiangjun. Analysis on reason of short operation cycle of mixed bed for condensed water fine treatment[J]. Huadian Technology, 2012, 34(10): 52-54.