[1] |
HE G, CHEN Q, KANG C. Cooperation of wind power and battery storage to provide frequency regulation in power markets[J]. IEEE Transactions on Power Systems, 2017, 32(5):3559-3568.
doi: 10.1109/TPWRS.2016.2644642
|
[2] |
孙冰莹, 杨水丽, 刘宗歧, 等. 国内外兆瓦级储能调频示范应用现状分析与启示[J]. 电力系统自动化, 2017, 41(11):8-16,38.
|
|
SUN Bingying, YANG Shuili, LIU Zongqi, et al. Analysis on present application of megawatt-scale energy storage in frequency regulation and its enlightenment[J]. Automation of Electric Power Systems, 2017, 41(11):8-16,38.
|
[3] |
李建林, 武亦文, 王楠, 等. 吉瓦级电化学储能电站研究综述及展望[J]. 电力系统自动化, 2021, 45(19):2-14.
|
|
LI Jianlin, WU Yiwen, WANG Nan, et al. Review and prospect of gigawatt-level electrochemical energy storage power station[J]. Automation of Electric Power Systems, 2021, 45(19):2-14.
|
[4] |
KUMAR R, WENZEL M, ELLIS M, et al. A stochastic model predictive control framework for stationary battery systems[J]. IEEE Transactions on Power Systems, 2018, 33(4):4397-4406.
doi: 10.1109/TPWRS.2017.2789118
|
[5] |
ZHANG Y, ZHAO C, TANG W, et al. Profit-maximizing planning and control of battery energy storage systems for primary frequency control[J]. IEEE Transactions on Smart Grid, 2016, 99:712-723.
|
[6] |
苗福丰, 唐西胜, 齐智平. 储能参与风电一次调频的容量优化[J]. 电工电能新技术, 2016, 35(4):23-29,42.
|
|
MIAO Fufeng, TANG Xisheng, QI Zhiping. Capacity optimization of energy storage participating to wind plant primary frequency regulation[J]. Advanced Technology of Electrical Engineering and Energy, 2016, 35(4):23-29,42.
|
[7] |
黄际元, 李欣然, 常敏, 等. 考虑储能电池参与一次调频技术经济模型的容量配置方法[J]. 电工技术学报, 2017, 32(21):112-121.
|
|
HUANG Jiyuan, LI Xinran, CHANG Min, et al. Capacity allocation of bess in primary frequency regulation considering its technical-economic model[J]. Transactions of China Electrotechnical Society, 2017, 32(21):112-121.
|
[8] |
马昱欣, 胡泽春, 刁锐. 新能源场站共享储能提供调频服务的日前优化策略[J/OL]. 电网技术:1-13[2021-11-24].https://doi.org/10.13335/j.1000-3673.pst.2021.1787.
|
|
MA Yuxin, HU Zechun, DIAO Rui. Day-ahead optimization strategy for shared energy storage of renewable energy power stations to provide frequency regulation service[J]. Power System Technology:1-13[2021-11-24].https://doi.org/10.13335/j.1000-3673.pst.2021.1787.
|
[9] |
XU B, SHI Y, KIRSCHEN S, et al. Optimal battery participation in frequency regulation markets[J]. IEEE Transactions on Power Systems, 2018, 33(6):6715-6725.
doi: 10.1109/TPWRS.2018.2846774
|
[10] |
孟庆强, 李湘旗, 禹海峰, 等. 考虑源-荷不确定性的储能电站优化规划[J]. 太阳能学报, 2021, 42(10):415-423.
|
|
MENG Qingqiang, LI Xianqi, YU Haifeng, et al. Optimal planning of energy storage power station considering source-charge uncertainty[J]. Acta Energiae Solaris Sinica, 2021, 42(10):415-423.
|
[11] |
KRISHNAMURTHY D, UCKUN C, ZHOU Z, et al. Energy storage arbitrage under day-ahead and real-time price uncertainty[J]. IEEE Transactions on Power Systems, 2017, 33(1):84-93.
doi: 10.1109/TPWRS.2017.2685347
|
[12] |
CHENG B, WARREN P. Cooptimizing battery storage for the frequency regulation and energy arbitrage using multi-scale dynamic programming[J]. IEEE Transactions on Smart Grid, 2016:2997-2005.
|
[13] |
姜欣, 刘萌, 王天梁, 等. 电网侧储能电站参与现货联合市场的竞价策略[J]. 电网技术, 2021, 45(9):3398-3408.
|
|
JIANG Xin, LIU Meng, WANG Tianliang, et al. Bidding strategy for grid-side energy storage power stations to participate in the spot joint market[J]. Power System Technology, 2021, 45(9):3398-3408.
|
[14] |
BORDIN C, HAROLD O, CROSSLAND A. A linear programming approach for battery degradation analysis and optimization in offgrid power systems with solar energy integration[J]. Renewable Energy, 2017, 101:417-430.
doi: 10.1016/j.renene.2016.08.066
|
[15] |
BERA A, ALMASABI S, TIAN Y, et al. Maximising the investment returns of a grid-connected battery considering degradation cost[J]. IET Generation,Transmission & Distribution, 2020, 14(21).DOI:10.1049/iet-gtd.2020.0403.
doi: 10.1049/iet-gtd.2020.0403
|
[16] |
童家麟, 洪庆, 吕洪坤, 等. 电源侧储能技术发展现状及应用前景综述[J]. 华电技术, 2021, 43(7):17-23.
|
|
TONG Jialin, HONG Qing, LYU Hongkun, et al. Development status and application prospect of power side energy storage technology[J]. Huadian Technology, 2021, 43(7):17-23.
|
[17] |
尹硕, 郭兴五, 燕景, 等. 考虑高渗透率和碳排放约束的园区综合能源系统优化运行研究[J]. 华电技术, 2021, 43(4): 1-7.
|
|
YIN Shuo, GUO Xingwu, YAN Jing, et al. Study on optimized operation on integrated energy system in parks with high permeability and carbon emission constraints[J]. Huadian Technology, 2021, 43(4): 1-7.
|
[18] |
PJM operating committee regulation update[Z]. https://www.pjm.com/-/media/committees-groups/committees/oc/2020/20201106/20201106-item-15-regulation-update.ashx.
|