水电站EPC总承包项目风险分析和控制

谢春旺,张继雄   

  1. 中国华电工程(集团)有限公司,北京 100048
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2009-06-25 发布日期:2009-06-25

Risk analysis and control for PEC general contract project of hydropower station

XIE Chunwang,ZHANG Jixiong   

  1. China Huadian Engineering Corporation Limited, Beijing 100048, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2009-06-25 Published:2009-06-25

摘要: 论述了水电站EPC总承包项目的风险和风险控制策略,指出水电站EPC总承包项目风险和利润并存。如果总承包商认真分析这些风险并加以预防,则可为企业自身带来丰厚利润;如果对风险认识不够,对风险控制不当,也会带来较大的经济损失。特别是国外水电站EPC项目,由于存在很多不可控的因素,更需谨慎对待。

关键词: 水电站, 项目总承包, 风险, 控制

Abstract: The risk of EPC general contract project of hydropower station and the risk control strategy were discoursed, and it was pointed out that the risk of EPC general contract project of hydropower station and the profits are existed at same time. If the general contractor can analyze these risks and prevent them earnestly, the project will bring huge profits for the enterprise; if the general contractor is not enough for the knowledge of the risks or he do not adopt correct prevention measures, the project also possibly brings larger economical losses. Especially, the PEC project of foreign hydropower station must be treated with more care due to many uncontrollable factors.

Key words: hydropower station, general contract project, risk, control