华电技术 ›› 2011, Vol. 33 ›› Issue (6): 37-39.

• 研究与开发 • 上一篇    下一篇

1.5MW大型水平轴风力发电机组安装

栾怀东,余正华,邵珠芬   

  1. 中国水利水电第五工程局有限公司,四川成都610066
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2011-06-25 发布日期:2011-06-25

Erection of 1.5MW large horizontal axis wind turbine generator system

LUAN Huaidong, YU Zhenghua, SHAO Zhufen   

  1. Sinohydro Bureau 5 Corporation Limited, Chengdu 610066, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-06-25 Published:2011-06-25

摘要: 介绍了河北华电沽源风电有限公司一期工程安装的1.5MW大型水平轴风力发电机组的结构特点、安装工艺流程、安装工程关键点及试运行前的调试项目,可供相同类型风力发电机组安装时参考。

关键词: 水平轴风力发电机组, 结构, 安装, 调试, 试运行

Abstract: A 1.5MW large horizontal shaft axis wind turbine generator system was erected in Hebei Huadian Guyuan Wind Power Corporation Limited project phase I. The structure features, erection technological process, the key points of the erection engineering and the debugging terms before commissioning of the wind turbine generator system were introduced; which can be used as reference for erection of similar wind turbine generator system.

Key words: horizontal axis wind turbine generator system, structure, erection, debug, trial operation