摘要: 摘要:托电公司4条送出线路都装设了串联补偿装置,以提高送出能力。为了抑制串联补偿装置投运后出现的次同步谐振问题,在各台主变压器中性点侧每相加装了阻塞滤波器,同时配置了机组轴系扭振保护和异步自励磁保护。阐述了次同步谐振问题产生的原理及采用的针对性抑制措施。通过分析系统异常方式下机组轴系扭振保护和异步自励磁保护的动作情况,验证了阻塞滤波对抑制次同步谐振的效果。
关键词: 关键词:次同步谐振, 轴系扭振, 异步自励磁, 阻塞滤波器
Abstract: Abstract:In order to increase the power transmission capacity, the series compensation devices were installed for the four output transmission lines of Togtoh Power Generation Company Limited. In order to restrain the subsynchronous resonance, which occurred after the series compensation devices were put into operation, the blocking filters were added to neutral point sides of each phase of each main transformer. In the same time, the unit shaft system torsional vibration protection and the asynchronous selfexcitation protection were configured. The reasons of subsynchronous resonance and the adopted targeted restraining measures were expounded. By means of analysis on actions of unit shaft system torsional vibration protection and the asynchronous selfexcitation protection under abnormal system operation condition, the effect of the blocking filter to restrain subsynchronous resonance was verified.
Key words: Key words:subsynchronous resonance, torsional vibration of shaft system, asynchronous selfexcitation, blocking filter
黄晓峰. 电力系统异常工况下次同步谐振对机组的影响[J]. 华电技术, 2013, 35(10): 6-9.
HUANG Xiaofeng. Influence of subsynchronous resonance on power unit under abnormal operation condition of power system[J]. Huadian Technology, 2013, 35(10): 6-9.