摘要: 摘要:介绍了火电厂发电机组自动控制系统,对汽轮机性能试验时保持阀位全开、保持阀位不变、保持高背压和高压加热器切除等工况进行了分析并提出了控制措施,可为电厂运行人员和性能试验工程师提供理论及实践指导。

关键词: 关键词:自动发电控制, 协调控制系统, 炉跟机, 汽轮机, 高背压, 高压加热器

Abstract: Abstract:The automatic control system of thermal power unit was introduced. Several conditions of turbine performance test, such as to keep the valve fully opened, to keep valve opening to be constant, to maintain high back pressure, to cut off high pressure heater and so on, were analyzed, and relevant control measures were put forward, which provide guidance for operators and performance testing engineers of power plant in both theory and practice.

Key words: Key words:automatic control system, coordinated control system, boiler follows turbine, steam turbine, high back pressure, high pressure heater