华电技术 ›› 2014, Vol. 36 ›› Issue (4): 47-48.

• 技术交流 • 上一篇    下一篇

净水站斜板沉淀池斜板改型升级

  

  1. (广东惠州天然气发电有限公司,广东惠州〓516082)
  • 出版日期:2014-04-25 发布日期:2014-06-16

Remodeling of skew board of skew board sedimentation basin in water purification station

  1. (Guangdong Huizhou LNG Power Generation Company Limited, Huizhou 516082, China)
  • Online:2014-04-25 Published:2014-06-16

摘要: 摘要:以广东惠州天然气发电有限公司为例,分析了一期净水站2×700t/h斜板沉淀池存在的问题。改用新型斜板和新型卡扣连接方式后,净水站斜板沉淀池恢复了安全、稳定、经济的运行状态。

关键词: 关键词:净水站, 斜板, 沉淀池, 改性, 卡扣连接

Abstract: Abstract:Taking Guangdong Huizhou LNG Power Generation Company Limited as example, the problems existing in 2×700t/h skew board sedimentation basin of the water purification station of project phase I were analyzed. After the novel skew board and novel snapin connection mode were applied, the water purification station returns to safe, stable and economical operating state.

Key words: Keywords:water purification station, skew board, sedimentation basin, modified, snapin connection