联合循环机组不设启动锅炉的可行性分析及应用实践

  

  1. 山东电力工程咨询院有限公司,济南〓250013
  • 出版日期:2016-12-25 发布日期:2017-02-04

Combined cycle unit without start up boiler possibility analysis and application

  1. Shandong Electric Power Engineering Consulting Institute Corporation Limited, Jinan 250013, China
  • Online:2016-12-25 Published:2017-02-04

摘要:

摘要:针对燃气-蒸汽联合循环机组轴系的不同配置特点,论述了机组不配置启动锅炉的适用性及可行性。结合某工程实践,在无启动锅炉、无外来蒸汽情况下,通过余热锅炉所产生的蒸汽作为启动蒸汽,研究了机组辅汽系统设计及其实际应用状况。

关键词:

Abstract:

Abstract:The applicability and possibility of not provide startup boiler was discussed based on gas steam combined cycle unit shaft configuration. Combined with project practice, in the situation of without startup boiler or other external steam, the design and application of unit auxiliary steam system was studied.