青溪水电站#2机组超出力发电可行性分析

刘远雄   

  1. 广东粤电青溪发电有限责任公司,广东大埔514200
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2010-06-25 发布日期:2010-06-25

Feasibility analysis of operation at excess output of unit No.2 in Qingxi Hydropower Station

LIU Yuanxiong   

  1. Guangdong Yudean Qingxi Power Generation Corporation Limited, Dabu 514200, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2010-06-25 Published:2010-06-25

摘要: 介绍了青溪水电站 #2机组的试验目的,阐述了 #2机组的试验工况要求、试验步骤及测量参数,给出了试验结论及建议。青溪水电站增容改造后,既增加了发电量和调峰容量,又取得了显著的经济效益和社会效益。

关键词: 水轮发电机组, 超出力, 可行性, 效率

Abstract: The test purpose of the unit No.2 of the Qingxi Hydropower Station was introduced. The requirements of the test condition, the test procedure and the measured parameters of the unit No.2 were expounded. The conclusion of the test and the suggestions were given. It was pointed out finally that after the capacityenlarge reformation of the Qingxi Hydropower Station, not only the power generation and the peak shaving capacity were increased, but also the remarkable economical benefits and social effects were obtained. 

Key words: hydroelectric generator set, excess output, feasibility, efficiency