Huadian Technology ›› 2008, Vol. 30 ›› Issue (9): 46-48.
• 一线动态 • Previous Articles Next Articles
JING Xu-cheng
Received:
Revised:
Published:
Abstract: According to the boiler building process of Huadian International Zouxian Power Plant, the production management about boiler equipment selection and boiler heating parts making was expounded. It was emphasized that must strengthen process management to prevent boiler tube cracking. The construction organization, coordination and management were strengthened, the field commission and operation were managed, the problems occurred in erection and commission were handled.
Key words: 1000MW unit, ultra-supercritical boiler, building process, erection and commission, organization and management
JING Xu-cheng. Analysis of 1000 MW Unit Boiler Building Process Management[J]. Huadian Technology, 2008, 30(9): 46-48.