Huadian Technology ›› 2008, Vol. 30 ›› Issue (9): 46-48.

• 一线动态 • Previous Articles     Next Articles

Analysis of 1000 MW Unit Boiler Building Process Management

JING Xu-cheng   

  1. Huadian Wuhu Power Generation Corporation Limited, Wuhu 241300, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2008-09-25 Published:2008-09-25

Abstract: According to the boiler building process of Huadian International Zouxian Power Plant, the production management about boiler equipment selection and boiler heating parts making was expounded. It was emphasized that must strengthen process management to prevent boiler tube cracking. The construction organization, coordination and management were strengthened, the field commission and operation were managed, the problems occurred in erection and commission were handled.

Key words: 1000MW unit, ultra-supercritical boiler, building process, erection and commission, organization and management