Huadian Technology ›› 2009, Vol. 31 ›› Issue (10): 16-18.
• 专题综述 • Previous Articles Next Articles
MA Shidong
Received:
Revised:
Published:
Abstract: Since the No.2 unit of a power plant was put into production, the economical indicators and the heat rate always were higher than the design values, and the unit efficiency was not reached to the design demand. Therefore, the turbine thermodynamic performance test was carried out before No.2 unit overhaul, and the turbine heat rate and the efficiency of high pressure cylinder and middle pressure cylinder under three operation conditions of 3VWO, 450MW and 300MW were obtained by calculation. Then the reason of higher heat rate of No.2 unit turbine had been found, and some optimization measures were proposed providing reference for overhaul and technical reformation of No.2 unit.
Key words: supercritical turbine set, heat rate, test condition, test data, reason analysis, optimization measure
MA Shidong. Reason of higher heat rate of the 600MW supercritical turbine[J]. Huadian Technology, 2009, 31(10): 16-18.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2009/V31/I10/16
Evaluation of prefilter improvement effect of gas turbine air intake filtration system