Huadian Technology ›› 2009, Vol. 31 ›› Issue (2): 16-18.

• 专题综述 • Previous Articles     Next Articles

Analysis of reformation of electrical equipment in Xiaoshunjiang Pump Station

WU Chungang, SHI Liandong   

  1. Shaoxing Tangpu Reservoir Corporation Limited, Shangyu 312364, China
  • Received:1900-01-01 Revised:1900-01-01 Published:2009-02-25

Abstract: The necessity of electrical equipment reformation in Xiaoshunjiang Water Transfer Pumping Station Project Phase I was analyzed. In order to ensure the water feeding to Shaoxing to be no interrupted and to ensure the construction quality of the project, the safety and fasibility of the reformation scheme were analyzed and compared. After reformation, the pumping station operated favorably, and the fault rate was reduced obviously.

Key words: water transfer pumping station, electrical quipment, reformation