Loading...
RSS
Toggle navigation
Home
About Journal
Editorial Board
Editorial Board
Publication Ethics
Journal Online
Just Accepted
Current Issue
Archive
Most Read Articles
Most Downloaded Articles
Most Cited Articles
Subscription
Advertisement
Contact Us
中文
Table of Content
25 February 2009, Volume 31 Issue 2
Previous Issue
Next Issue
特约
专题综述
研究与开发
技术交流
新能源
特约
Reflection on scientific and technological innovation in China Huadian Corporation
ZHANG Dongxiao
2009, 31(2): 1-3.
Asbtract
(
1136
)
Related Articles
|
Metrics
专题综述
The lifetime diagnosis of superheater based on oxide skin measurement
LIU Hongguo
2009, 31(2): 4-6.
Asbtract
(
1415
)
Related Articles
|
Metrics
The superheater pipes of a certain power plant were detected by using the fast, non-destructive testing of inside oxide skin of boiler pipes and metallographic examination, and their lifetimes were diagnosed. The result shows that the thickness of inside oxide skin of superheater pipes is less than 0.15mm, the thickness of metal layer is no found to reduce obviously, its hardness is normal, the aging level of 12Cr1MoV is 3 which is moderate aging, TP347shows aging trend, the residual lifetimes of each pipe are longer than 60000h.
Test and analysis of welding residual stress of interflow type hydraulic turbine runner
LEI Qinghua
2009, 31(2): 7-10.
Asbtract
(
1243
)
Related Articles
|
Metrics
Based on the residual stress tests of interflow type hydraulic turbine runner of some hydroelectric power stations in southwest China, this article introduced the indentation strain gage method and its characteristics of the newest application in hydraulic turbine runner residual stress tests, and according to the test data, the runner residual stress distributed condition was analyzed. Combine with the information of other hydroelectric power stations, the reasons of crack appeared have been discussed in the runner production process and operation, the relation between crack and welding residual stress has obtained. The way to solve the question has been put forward finally.
Application of synchronized online chemical cleaning technology in power plant
KONG Qingfu;MIN Zhihui
2009, 31(2): 12-15.
Asbtract
(
1348
)
Related Articles
|
Metrics
The synchronized online chamecial cleaning of 3×390MW units circulating water system was implemented by using the chamecal online cleaning technology, in which the Y-CH107 cleaning agent was used, the integrated biofouling removal, cleaning and passivation processes were adopted. The cleaning process did not influence units generation, the pH value was controled in range 4 to 5. Then the corrosion rates of materials in the system were controled effectively. Taking the 3×390MW combined gas and steam turbine units of Hangzhou Huadian Banshan Generation Corporation Limited as examples, the application, implement process and effect of circulating water system chamecal online cleaning technology were described briefly, and its economic benefit was analyzed.
Analysis of reformation of electrical equipment in Xiaoshunjiang Pump Station
WU Chungang;SHI Liandong
2009, 31(2): 16-18.
Asbtract
(
1244
)
Related Articles
|
Metrics
The necessity of electrical equipment reformation in Xiaoshunjiang Water Transfer Pumping Station Project Phase I was analyzed. In order to ensure the water feeding to Shaoxing to be no interrupted and to ensure the construction quality of the project, the safety and fasibility of the reformation scheme were analyzed and compared. After reformation, the pumping station operated favorably, and the fault rate was reduced obviously.
Analysis of a reversed feeding fault from secondary to primary circuit in the substation
SHU Yishi;MA Yong;YU Peijie
2009, 31(2): 19-21.
Asbtract
(
1407
)
Related Articles
|
Metrics
A reversed feeding fault from secondary to primary circuit in the medium pressure switch No.2 main transformet of Chapeng Substation at turn on operation was analyzed. The reason of the reversed feeding fault was found, and the dangers of the fault to system were expounded. Aiming at the defect of feeding operation, some improvement measures were proposed for the elated technician referring.
Analysis of ash fouling of air preheater and solving measures
XIAO Xingquan
2009, 31(2): 22-23.
Asbtract
(
2069
)
Related Articles
|
Metrics
The serious ash fouling fault was happened in air preheater of boiler No.4 of Xinjiang Huadian Hongyanchi Power Generation Corporation Limited, which influenced on the stability of pulverized coal combustion and the safety of electrostatic precipitator, and the boiler was be compelled to shut down for cleaning the deposited ash manually. The reason of ash fouling in air preheater was analyzed, some detailed preventive measures were put forward, and the problems of ash fouling in air preheater and low temperature corrosion were solved.
Design of water regime autoforecasting system based on GPRS technique
SHAO Jiangli
2009, 31(2): 24-25.
Asbtract
(
1274
)
Related Articles
|
Metrics
A water regime autoforecasting system based on the general packet radio service(GPRS) technique was designed for the forecasting system working timely and accurately, the system was composed by telemetry station, GPRS modules and information center, and the modules are includes data acquisition module, information transmission module and memory analyzing module. It has been proved by application that the system was high reliability, wide covering range, convenient stationing, easy expansion, fast networking, low cost of maintenance.
研究与开发
Study on hydraulic plan in plant location selection of nuclear power plant
ZHOU Jinquan
2009, 31(2): 26-31.
Asbtract
(
1227
)
Related Articles
|
Metrics
The promulgation of 《Medium and Long Term Nuclear Power Industry Development Plan (2005—2020)》 by China State Council indicated the policy for nuclear power industry would change from "proper development" to "positive development". Except the coastal area, new nuclear power plants will also be constructed in inner land area. The plant location selection of nuclear power plant should be very scientifically, carefully and strictly, beside geology, meteorology, hydrology, hydraulic, nature environment and safety, the problems about adopting natural ventilation, mechanical draft cooling tower for water resource saving, ensuring safe water supplication and satisfying the discharge standard should be considered especially in inner land area.
The research of fusion diagnosis method based on D-S evidence theory for vibration signals of centrifugal pump
FAN Zhihua;HONG Jun
2009, 31(2): 32-35.
Asbtract
(
1180
)
Related Articles
|
Metrics
According to the characteristics of fault diagnosis for centrifugal pump, wavelet package decomposition and reconstruction technique is used to extracting frequency band energy feature, a fusion diagnosis method is presented by using fuzzy neural network and D-S evidence theory for centrifugal pump. Firstly, according to the method of wavelet package, vibration signals of displacement and acceleration of centrifugal pump were disposed and transformed into feature vector value; then, two subFNN structures were established, and their training samples were obtained. After two subFNN were trained successfully, the intermediate diagnosis results were obtained through two subFNN. Finally, the FNN diagnosis results were used as the basic probability distribution value to each fault mode, and the D-S evidence theory was applied, and the final fusion diagnosis results were obtained. The experimental result was to verify the method presented in this paper.
Generator hydrogen data management system Based on VB
CAO Deping
2009, 31(2): 36-39.
Asbtract
(
2223
)
Related Articles
|
Metrics
Based on Visual Basic 6.0, according to the related regulations and calculation methods of DL/T 651—1998《Requirements for Hydrogen Humidity of Generators Using Hydrogen as a Coolant》,quoting some application software such as Microsoft Office Access, Microsoft Excel,the generator hydrogen data management system was developed. The problem of converting the hydrogen humidity of generator by Lookup table only is resolved, and standardization and routinization of hydrogen data storage was realized. This system was applied in Hunan Huadian Changsha Power Generation Corporation Limited successfully, the calculation and management of hydrogen data was rapider, more convenient and more normative due to application of this system.
技术交流
Reason analysis of common faults of frequency converter and handling
ZHANG Hao;HAO Peijun;CHANG Shujiang
2009, 31(2): 40-44.
Asbtract
(
1144
)
Related Articles
|
Metrics
The faults of frequency converters inslalled in subsidiary system of Shanxi Guohua Jinjie Energy Source Corporation Limited in 2007 were analyzed. The common faults of frequency converters and relevant handling measures were summarized and provided to relevant technican for reference.
Improvement of measurement and adjustment of labyrinth clearance in turbine set
WEI Tiechen
2009, 31(2): 45-47.
Asbtract
(
1493
)
Related Articles
|
Metrics
The function of steam sealing is to reduce the steam leakage loss of turbine. The qualified labyrinth clearance can ensure the relative inner efficiency of turbine, smaller labyrinth clearance will influence on turbine safety operation, and bigger labyrinth clearance will reduce inner efficiency of turbine. In overhaul, the adjustment quality of labyrinth clearance is very important for turbine safety, economical operation. The traditional labyrinth clearance overhaul process has some defects which cause the qualification rate of labyrinth clearance to be lower. The test and adjustment methods of labyrinth clearance were improved, and which was helpful for unit safety and economical operation.
Analysis of the signal "springstored energy is abnormal" of breaker and handling plan
ZHANG Fuping
2009, 31(2): 48-49.
Asbtract
(
1368
)
Related Articles
|
Metrics
The signal "springstored energy is abnormal" was given out frequently by the breaker spring storage operation mechanism in Jinshuitan Hydropower Plant.The three states indicated by the signal "springstored energy is abnormal" were analyzed. The signal processing flow of programable logic controler(PLC) was optimized, and the handling plan for improving the signal "springstored energy is abnormal" was proposed.
Discussion on reform of circulating cooling water system in 125MW unit
HUANG Wei
2009, 31(2): 50-51.
Asbtract
(
1199
)
Related Articles
|
Metrics
The existed problems of the low condenser vacuum value and low thermal efficiency of 125MW unit in Pingxiang Power Plant were analyzed. The problems have been solved by reforming the circulating cooling water system, and the favorable results have been reached.
Application of grid islanding and load shedding schedule in INDORAMA Project of Indonesia
MA Hongtao
2009, 31(2): 52-54.
Asbtract
(
1203
)
Related Articles
|
Metrics
The characteristic,logical function and application of grid islanding and load shedding schedule were introduced, which was applied in the partial power net composed by the INDORAMA Captive Power Plant, INDORAMA SYNTHETICS TBK and Indonesia National Power Grid (PLN). In the process of formulation and implementation of the technical schedule, not only the demands of electrical system standards of China were considered, but also the experiences of abroad electric system experts were absorbed and syncretized. When the voltage of National Power Grid is failure, the schedule can ensure the Captive Power Plant can operate at islanding mode, and can shed load automatically according to the plant capacity and practical load. The schedule is summary of Capital Power Plant (small power synchronized system) splitting and load sheding design and logical function, and it is expected that the schedule is helpful for the engineers working at power plant construction.
Analysis of the "blower pinch" of the primary air fan in CFB boiler
ZHAO Xiaodong;ZHANG Lequn
2009, 31(2): 55-59.
Asbtract
(
1463
)
Related Articles
|
Metrics
The technical reformation of fans by using the frequency converter is gradually becoming the popular way to increase the efficiency of the power plant. However, the problem of "blower pinch" was happened sometimes due to application of the frequency converter, which causes a great threat to the safety operation of the power plant. The "blower pinch" phenomenon occurred in a power plant after the frequency conversion reformation was analyzed, and feasible solving measures were proposed.
Online setting of safety valve in main steam pipe of ultrasupercritical boiler
SHAO Tianyou;MA Chuangang
2009, 31(2): 60-62.
Asbtract
(
1139
)
Related Articles
|
Metrics
The first Blevel maintenance of boiler No.2 of 1000MW ultrasupercritical unit in Huaneng Yuhuan Power Plant was accomplished after one year of operation, and online setting process was used in the maintenance for the safety valve of boiler pipe. The principle and the process flow of online setting were introduced emphatically, the result of online setting was analyzed. The problems occurred in setting process and their solution were described, according to these, some rationalization suggestions for subsequent safety valve setting of ultra-supercritical boiler were proposed.
Reason analysis of bush burning loss fault of steamdriven feed pump in 600MW unit and countermeasure
WANG Yong;ZENG Yuehu
2009, 31(2): 63-66.
Asbtract
(
1823
)
Related Articles
|
Metrics
The bush burning loss fault of steamdriven feed pump was happened repeatedly in 2×600MW units of Hunan Huadian Changsha Power Generation Corporation Limited, and which caused a grave threat to units safety operation. The parameters before and after bush burning loss were compared, the bush burning loss appearance was analyzed, and some experiments were accomplished. Then the basic reasons of bush burning loss fault were found which is that there were large particulates in oil and the oil temperature was lower at operation. A series of measures were adopted which includes to increase the lubricating oil pressure, to enlarge the oil inlet throttling plate and to control the oil temperature of small turbine strictly and others, so the problem of bush burning loss was resolved effectively.
The prevention measures of steam turbine unloading at startingup process of S109FA unit
CHENG Tu;YU Lifan
2009, 31(2): 67-70.
Asbtract
(
1207
)
Related Articles
|
Metrics
The problem of steam turbine unloading of S109FA unit was introduced. The reason of steam turbine unloading, which often occurred at cold start process, was analyzed in detail. The effective method for solving the problem was proposed, which can be used as reference for same unit in other plants also.
新能源
Exploiting and application of Clean Development Mechanism
FANG Zheng
2009, 31(2): 71-73.
Asbtract
(
1822
)
Related Articles
|
Metrics
The main content of Clean Development Mechanism, the project exploiting procedure and the development of international carbon market were introduced. Based on this, the application of Clean Development Mechanism in domestic, the transaction method and its impetus to the new energy source development were expounded. The development potential of Clean Development Mechanism market was prospected.
Biogas power generation technology and waste heat utilization technology
LIU Xianming;LI Heping;YUN Xiaoyin;ZHANG Yu;QIU Hemei
2009, 31(2): 74-78.
Asbtract
(
1356
)
Related Articles
|
Metrics
The development of biogas power generation technology was introduced. Based on the four determinant indexes which inclutes the total solid, the biochemical oxygen demand, the chemical oxygen demand and volatile solid, combining with the principle of practical fermentation process, the biogas productions of diffirent raw materials were obtained. Aimming at the practical situation of biogas power generation project, the fasibilities of several plans for waste heat utilization of biogas power generation were discussed.
Author Center
Online Submission
Citation Format
Copyright Agreement
Template
Author Guidelines
Review Center
Peer Review
Editor Work
Editor-in-Chief
Office Work
Journal Online
Just Accepted
Current Issue
Archive
Most Read Articles
Most Downloaded Articles
Most Cited Articles