The reason analysis of leakage at welding seam of reheater tube supports in 660MW unit

ZHANG Yujun, WANG Yuxing   

  1. Hanfeng Power Plant,China Huaneng Group, Handan 056200, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2009-09-25 Published:2009-09-25

Abstract: The reasons of leakage at welding seam of reheater tubes supports of 660MW unit in Hanfeng Power Plant of China Huaneng Group were analyzed. A reformation scheme was proposed and adopted, which advocates change the fixed support structure into movable support structure. After reformation, the leakage was not occurred again.

Key words: reheater, leakage, additional stress, reheating crack