Abstract: The configuration and the action process of the primary protection of the water turbinegenerator set were introduced. The problems existed in primary overspeed protection were analyzed. The technical reformation scheme of the primary overspeed protection was put forward. After the reformation scheme was implemented, the faulty action of the primary overspeed protection no longer occurred.
Key words: primary overspeed protection, faulty action, time-delay, reason analysis, technical reformation scheme
YANG Shiyong. Problems existing in primary overspeed protection and its technical reformation scheme[J]. Huadian Technology, 2010, 32(11): 50-51.