Huadian Technology ›› 2010, Vol. 32 ›› Issue (8): 18-22.
• 研究与开发 • Previous Articles Next Articles
FANG Lian,LI Ou
Received:
Revised:
Published:
Abstract: The main reasons of the unplanned outage of the main and auxiliary equipments in power plant were analyzed, and the prepared schemes of main systems were researched. Based on these, the scheme was put forward, which can ensure the availability rate of the 600MW unit to be not less than 95% and the utilization rate to be not less than 80%.
Key words: 600MW unit, availability rate, utilization rate, control scheme
FANG Lian;LI Ou. Analysis on ensuring availability rate and utilization rate of 600MW unit[J]. Huadian Technology, 2010, 32(8): 18-22.