Huadian Technology ›› 2010, Vol. 32 ›› Issue (8): 70-72.
• 节能与环保 • Previous Articles Next Articles
L Xinfeng
Received:
Revised:
Published:
Abstract: Aiming at the features of commissioning and operation of the wastewater treatment system in wet FGD project of Guohua Ninghai Power Plant project phase II (2×1000MW), the sources, the quality and the treatment process flow of the wastewater were analyzed. The operation parameters of the wastewater treatment and the laws of rational operation for the wastewater treatment system were summarized. Some relevant rational proposals for wastewater treatment operation were put forward, which can be used as reference for the same professional in wastewater treatment of thermal power plant.
Key words: lime stone-gypsum wet flue gas desulphurization, wastewater treatment, process flow, water quality feature
L Xinfeng. Wastewater treatment technology for lime stonegypsum WFGD system[J]. Huadian Technology, 2010, 32(8): 70-72.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2010/V32/I8/70